stucco begins

Img_2091Img_2090Img_2092

the stucco crew was here today.  they got about 70% done or so.  The first picture shows the difference between 3 days of drying (note the inside of the column is lighter gray thand the fresh street-side coat).

the second picture shows their texture work, which is trying to match as close as possible the stucco pattern on our house and the front porch pillars.

Advertisements

One thought on “stucco begins

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s