new beds along the patio step

Img_0785Img_0787Img_0789Img_0788Img_0790

Spent all day on Labor Day working on the new bed that will connect the patio to the grass.  Because there is a step that runs east-west from the elm tree to the garage, we needed a way to get down to the level of the grass area.  We added two beds with a step break in between.  On Sunday we did the prep work for the beds by adding irrigation lines as well as some low-voltage lighting wire.  We also pulled a section of the old pavers to get irrigation and lighting into the elm tree well.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s